File #: 25-0639    Version: 1 Name:
Type: Resolution-Agreement Status: Consent Agenda
File created: 6/18/2025 In control: Transportation
On agenda: 7/8/2025 Final action:
Title: Adoption of Resolution Approving Department of Transportation Agreement Number 230044 with MGE Engineering Inc. in the Amount of $1,832,000 for Professional Engineering Design Services, and Authorizing an Additional Contingency Amount of $183,000, for the Camp 1 Ten Mile Road Bridge Replacement Project over South Fork Ten Mile River, County Road 427, Mile Post 1.88 (Fort Bragg Area)
Attachments: 1. Resolution, 2. Agreement, 3. Letter

To:  BOARD OF SUPERVISORS

From:  Transportation

Meeting Date:  July 8, 2025

 

Department Contact:  

Howard N. Dashiell

Phone: 

707-463-4363

Department Contact:  

Alicia Winokur

Phone: 

707-463-4363

 

Item Type:   Consent Agenda

 

Time Allocated for Item: N/A

 

 

Agenda Title:

title

Adoption of Resolution Approving Department of Transportation Agreement Number 230044 with MGE Engineering Inc. in the Amount of $1,832,000 for Professional Engineering Design Services, and Authorizing an Additional Contingency Amount of $183,000, for the Camp 1 Ten Mile Road Bridge Replacement Project over South Fork Ten Mile River, County Road 427, Mile Post 1.88 (Fort Bragg Area)

End

 

Recommended Action/Motion:

recommendation

Adopt Resolution approving Department of Transportation Agreement number 230044 with MGE Engineering Inc. in the amount of $1,832,000 for professional engineering design services, and authorizing an additional contingency amount of $183,000, for the Camp 1 Ten Mile Road Bridge Replacement Project over South Fork Ten Mile River, County Road 427, Mile Post 1.88 (Fort Bragg Area); and authorize Chair to sign the same.

End

 

Previous Board/Board Committee Actions:

None.                     

 

Summary of Request

Department of Transportation (DOT) Agreement Number (No.) 230044 provides for preliminary engineering and design work, including environmental studies, plans, specifications, and estimates, needed for the Camp 1 Ten Mile Road Bridge Replacement Project over South Fork Ten Mile River.  MGE Engineering Inc. has agreed to perform the required work for a not-to-exceed amount of $1,832,000.  Costs of the project are to be funded primarily through the Federal Highway Administration (FHWA) Highway Bridge Program (HBP), covering 88.53% of the costs, with the remaining 11.47% local match covered with road funds.  Future amendments for additional work will be determined based on supplemental funding from FHWA.  DOT requests the Board approve the agreement with MGE in the amount of $1,832,000.  Because additional studies or additional field investigations are often identified during design, DOT deems it prudent to authorize the Director of Transportation a 10% contingency of $183,000, to process contract amendments as needed in order to facilitate timely completion of the work.

 

Alternative Action/Motion:

Postpone approval of DOT Agreement No. 230044.                     

 

Strategic Plan Priority Designation: A Prepared and Resilient County

 

Supervisorial District:  District 4

                                          

Vote Requirement:  Majority

                                          

 

 

Supplemental Information Available Online At: N/A

 

Fiscal Details:

source of funding: FHWA HBP #BRLO-5910(138) - 88.53%, Road Fund (BU 3041) - 11.47%

current f/y cost: $113,631

budget clarification: N/A

annual recurring cost: N/A

budgeted in current f/y (if no, please describe): Yes

revenue agreement: No

AGREEMENT/RESOLUTION/ORDINANCE APPROVED BY COUNTY COUNSEL: Yes

CEO Liaison: Steve Dunnicliff, Deputy CEO                                                               

CEO Review: Yes                                            