File #: 24-0207    Version: 1 Name:
Type: Resolution Status: Consent Agenda
File created: 1/22/2024 In control: Transportation
On agenda: 2/6/2024 Final action:
Title: Adoption of Resolution Authorizing the Department of Transportation to Advertise for Bids and Award Department of Transportation Contract Number 200093 for Construction of the Ackerman Creek Bridge Replacement on North State Street, County Road 104, Milepost 0.97, at an Estimated Cost of $15,000,000 (Ukiah Area)
Attachments: 1. Resolution 24-023, 2. Resolution, 3. Letter
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

To:  BOARD OF SUPERVISORS

From:  Transportation

Meeting Date:  February 6, 2024

 

Department Contact:  

Howard N. Dashiell

Phone: 

707-463-4363

Department Contact:  

Alicia Winokur

Phone: 

707-463-4363

 

Item Type:   Consent Agenda

 

Time Allocated for Item: N/A

 

 

Agenda Title:

title

Adoption of Resolution Authorizing the Department of Transportation to Advertise for Bids and Award Department of Transportation Contract Number 200093 for Construction of the Ackerman Creek Bridge Replacement on North State Street, County Road 104, Milepost 0.97, at an Estimated Cost of $15,000,000 (Ukiah Area)

End

 

Recommended Action/Motion:

recommendation

Adopt Resolution authorizing the Department of Transportation to advertise for bids and award Department of Transportation Contract Number 200093 for construction of the Ackerman Creek Bridge replacement on North State Street, County Road 104, milepost 0.97, at an estimated cost of $15,000,000 (Ukiah Area); and authorize Chair to sign same.

End

 

Previous Board/Board Committee Actions:

By Resolution Number (No.) 08-239 (December 9, 2008), the Board of Supervisors (BOS) approved and executed a Memorandum of Understanding, BOS Agreement No. 08-214/Department of Transportation (DOT) Agreement No. 080109, with Mendocino College, through their Redevelopment Agency (RDA) Funds, regarding the North State Street “Gateway Revitalization Project” for the cooperative repayment plan between the College and County, including the Ackerman Creek Bridge Replacement on North State Street. By Resolution No. 11-093 (June 14, 2011), the BOS approved BOS Agreement No. 11-056/ DOT Agreement No. 110002 with Quincy Engineering, Inc. (QEI), for professional services to complete the plans, specifications, and estimate for the replacement of Ackerman Creek Bridge on North State Street. By Resolution No. 16-016, the BOS adopted an Initial Study/Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program in compliance with the California Environmental Quality Act (CEQA) requirements for the Ackerman Creek Bridge Replacement project on North State Street. By Resolution No. 21-048, the BOS authorized DOT to advertise and award DOT contract No. 200093 at an estimated cost of $9,889,000.                     

 

Summary of Request

Mendocino County Department of Transportation will prepare and administer construction plans, specifications, estimates, and contract documents for DOT Contract No. 200093, for the replacement of the Ackerman Creek Bridge on North State Street, CR 104, milepost 0.97. This project is for the construction of a new bridge on the same alignment, removal of the existing concrete and steel bridge, and streambed restoration. The work is anticipated to span two construction seasons. BOS previously authorized DOT to advertise for bids and award DOT Contract No. 200093. However, due to a delay in funding and rising construction costs, the current engineer’s estimate exceeds the original authorized cost estimate. The current total construction costs, including contingency, are estimated at $15,000,000. The project is anticipated to be 88.53% reimbursable through the Federal Highway Administration (FHWA) Highway Bridge Program (HBP) with the local match funded through College RDA funds, State Transportation Improvement Program (STIP), Coronavirus Response and Relief Supplemental Appropriations Act of 2021 (CRRSAA), and the Road Fund.

 

Alternative Action/Motion:

Postpone award of the contract and delay commencement of construction.                     

 

Strategic Plan Priority Designation: A Prepared and Resilient County

 

Supervisorial District:  District 2

                                          

vote requirement:  Majority

                                          

 

 

Supplemental Information Available Online At: N/A

 

Fiscal Details:

source of funding: FHWA HBP, RDA, STIP, CRRSAA, and Road Fund

 

current f/y cost: $250,000

 

annual recurring cost: N/A

 

budgeted in current f/y: Yes

if no, please describe: N/A

revenue agreement: No

AGREEMENT/RESOLUTION/ORDINANCE APPROVED BY COUNTY COUNSEL: Yes

CEO Liaison: Steve Dunnicliff, Deputy CEO                                                               

CEO Review: Yes                                            

CEO Comments:

 

FOR COB USE ONLY

Executed By: Atlas Pearson, Senior Deputy Clerk

Final Status: Adopted

Date: February 6, 2024

Executed Item Type: Resolution

 

Number: 24-023