Title: Adoption of Resolution Approving Department of Transportation Agreement Number 240005, with Consor North America, Inc., in the Amount of $5,617,000 for Allocation 1, for Professional Engineering Design Services, and Authorizing an Additional Contingency Amount of $200,000, for the Brooktrails Second Access Project (Willits/Brooktrails Area)
Attachments: 1. Resolution 24-061, 2. Agreement 24-056, 3. Resolution, 4. Letter
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

To:  BOARD OF SUPERVISORS

From:  Transportation

Meeting Date:  April 23, 2024

 

Department Contact:  

Howard N. Dashiell

Phone: 

(707) 463-4363

Department Contact:  

Alicia Winokur

Phone: 

(707) 463-4363

 

Item Type:   Consent Agenda

 

Time Allocated for Item: N/A

 

 

Agenda Title:

title

Adoption of Resolution Approving Department of Transportation Agreement Number 240005, with Consor North America, Inc., in the Amount of $5,617,000 for Allocation 1, for Professional Engineering Design Services, and Authorizing an Additional Contingency Amount of $200,000, for the Brooktrails Second Access Project (Willits/Brooktrails Area)

End

 

Recommended Action/Motion:

recommendation

Adopt Resolution approving Department of Transportation Agreement Number 240005, with Consor North America, Inc., in the amount of $5,617,000 for allocation 1, for professional engineering design services, and authorizing an additional contingency amount of $200,000, for the Brooktrails Second Access Project (Willits/Brooktrails Area); and authorize Chair to sign the same.

End

 

Previous Board/Board Committee Actions:

By Resolution Number (No.) 07-218 (November 6, 2007) the Board of Supervisors (BOS) approved BOS Agreement Number (No.) 07-241/Department of Transportation (DOT) Agreement No. 070056, with the KOA Corporation (KOA), for completion of a feasibility study for the Brooktrails Second Access Project. By Resolution No. 09-101 (May 19, 2009), the BOS approved BOS Agreement No. 09-077/DOT Agreement No. 090112, Amendment No. 1 to Agreement No. 07-241/070056, with KOA.  By Resolution No. 11-070 (May 17, 2011), the BOS authorized DOT to award BOS Agreement No. 11-045/DOT Agreement No. 100086 for the Brooktrails Second Access - Preliminary Engineering - Phase 1, which was awarded to Drake Haglan & Associates (DHA). By Resolution No. 11-161 (December 13, 2011), the BOS approved BOS Agreement No. 11-045A1/DOT Agreement No. 110113, Amendment No. 1 to Agreement No. 11-045/100086, with DHA. By Resolution No. 12-021 (February 13, 2012), the BOS accepted the revised Feasibility Study for the Brooktrails Second Access Project and approved BOS Agreement No. 11-045A2/DOT Agreement No. 120009, Amendment No. 2 to Agreement No. 11-045/100086, for work to be performed under the Brooktrails Second Access - Phase 2 - Project Approval and Environmental Documentation (PA&ED), with DHA. By Resolution No. 23-106 (June 6, 2023), the BOS authorized the Director of Transportation to apply for 2 separate Local Transportation Climate Adaptation Program (LTCAP) for the Redemeyer Road Extension and the Brooktrails Second Access projects, accept the grants if awarded, and sign any other necessary related documents                     

 

Summary of Request

DOT Agreement No. 240005 provides for preliminary engineering and design work, including project approval and environmental documents (PA&ED), and plans, specifications, and estimate (PS&E), needed for the Brooktrails Second Access Project.  The design will be for a new, approximately 2-mile, two-lane arterial local road with paved shoulders and a new local bridge structure over Upp Creek, connecting Sherwood Road at the intersection of Primrose Drive to North Main Street in Willits. Consor North America, Inc. has agreed to perform the required work to complete the PA&ED phase, as Allocation No. 1, for a not-to-exceed amount $5,617,000. The final cost and scope of the required work to complete the PS&E phase, as Allocation No. 2, will be finalized as a contract amendment once those funds are allocated. The costs for the PS&E phase are estimated to be between $2,600,000 and $3,200,000. Costs of the project are to be funded entirely through LTCAP, which awarded $12,000,000 for completion of PA&ED and PS&E.  Future amendments for additional environmental and design work will be covered by the LTCAP.  Due to funding requirements, it is prudent to begin work with the existing funds from Allocation No. 1, followed by Allocation No. 2, upon receiving allocation of the additional grant funding.  DOT believes it would be expedient to request a contingency amount of $200,000 to facilitate timely completion of the PA&ED work.

 

Alternative Action/Motion:

Postpone approval of DOT Agreement No. 240005.                     

 

Strategic Plan Priority Designation: A Prepared and Resilient County

 

Supervisorial District:  District 3

                                          

vote requirement:  Majority

                                          

 

 

Supplemental Information Available Online At: https://www.mendocinocounty.gov/home/components/rfp/rfp/2278/385

 

Fiscal Details:

source of funding: Local Transportation Climate Adaptation Program

 

current f/y cost: $200,000 (estimated)

 

annual recurring cost: N/A

 

budgeted in current f/y: No

if no, please describe: Project not specifically budgeted for because grant was awarded after budget development but funds are available in Budget Unit 3041 and project is 100% reimbursable.

revenue agreement: N/A

AGREEMENT/RESOLUTION/ORDINANCE APPROVED BY COUNTY COUNSEL: Yes

CEO Liaison: Steve Dunnicliff, Deputy CEO                                                               

CEO Review: Yes                                            

CEO Comments:

 

FOR COB USE ONLY

Executed By: Atlas Pearson, Senior Deputy Clerk