TO: BOARD OF SUPERVISORS
FROM: Planning and Building Services
MEETING DATE: October 8, 2024
DEPARTMENT CONTACT:
Shelby Miller
PHONE:
707-234-6650
DEPARTMENT CONTACT:
Julia Krog
PHONE:
707-234-6650
ITEM TYPE: Consent Agenda
TIME ALLOCATED FOR ITEM: N/A
AGENDA TITLE:
title
Acceptance of Informational Report Regarding the Issuance of Emergency Coastal Development Permit EM_2024-0003 (Balderston) to Install Drilled Piers, a Grade Beam Foundation System, and a Perimeter Foundation Drain, Located at 12700 N. Highway 1, Mendocino; APN: 118-320-05
End
RECOMMENDED ACTION/MOTION:
recommendation
Accept informational report regarding the issuance of Emergency Coastal Development Permit EM_2024-0003 (Balderston) to install drilled piers, a grade beam foundation system, and a perimeter foundation drain, located at 12700 N. Highway 1, Mendocino; APN: 118-320-05.
End
PREVIOUS BOARD/BOARD COMMITTEE ACTIONS:
In 1991 the Board adopted Division II of Title 20 of Mendocino County Code through Ordinance No. 3785. Included in Division II is Section 20.536.055 which allows Permits for Approval of Emergency Work. In cases of a verified emergency, temporary emergency authorization to proceed with remedial measures may be given by the Director or his or her designee until such time as a Coastal Development Permit application is filed. The Director shall report in writing to the Board of Supervisors at each meeting the emergency permits applied for or issued since the last report, with a description of the nature of the emergency and the work involved. The report of the Director shall be informational only. The decision to issue an emergency permit is solely at the discretion of the Director. Notice of emergency permits shall be provided by phone or letter to the California Coastal Commission within three (3) days, following issuance of the emergency permit.
SUMMARY OF REQUEST:
The single-family residence was built in 1941. Seasonal seepage is the primar...
Click here for full text