Mendocino Logo
File #: 17-0327    Version: 1 Name:
Type: Resolution Status: Consent Agenda
File created: 4/28/2017 In control: Transportation
On agenda: 5/16/2017 Final action:
Title: Adoption of Resolution Authorizing Department of Transportation to Advertise for Bids and Award Twelve Department of Transportation Contracts to Construct 2016 and 2017 Storm Damage Permanent Repairs on Peachland Road, County Road 128, Milepost 0.35, Milepost 0.95, and Milepost 1.14; Eel River Road, County Road 240B, Milepost 7.85 and Milepost 8.10; Laytonville Dos Rios Road, County Road 322, Milepost 3.34, Milepost 3.66, and Milepost 4.19; Pine Ridge Road, County Road 220, Milepost 4.52 and Milepost 5.30; Blackhawk Drive, County Road 371, Milepost 2.00; Low Gap Road, County Road 212, Milepost 19.40 (Countywide)
Sponsors: Transportation
Attachments: 1. Resolution 17-065
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO: Board of Supervisors
FROM: Transportation
MEETING DATE: May 16, 2017


DEPARTMENT CONTACT:
Howard N. Dashiell
PHONE:
463-4363


ITEM TYPE: Consent Agenda

TIME ALLOCATED FOR ITEM: N/A


AGENDA TITLE:
title
Adoption of Resolution Authorizing Department of Transportation to Advertise for Bids and Award Twelve Department of Transportation Contracts to Construct 2016 and 2017 Storm Damage Permanent Repairs on Peachland Road, County Road 128, Milepost 0.35, Milepost 0.95, and Milepost 1.14; Eel River Road, County Road 240B, Milepost 7.85 and Milepost 8.10; Laytonville Dos Rios Road, County Road 322, Milepost 3.34, Milepost 3.66, and Milepost 4.19; Pine Ridge Road, County Road 220, Milepost 4.52 and Milepost 5.30; Blackhawk Drive, County Road 371, Milepost 2.00; Low Gap Road, County Road 212, Milepost 19.40 (Countywide)
End

RECOMMENDED ACTION/MOTION:
recommendation
Adopt Resolution authorizing Department of Transportation to advertise for bids and award twelve Department of Transportation contracts to construct 2016 and 2017 storm damage permanent repairs on Peachland Road, County Road (CR) 128, milepost (MP) 0.35, MP 0.95, and MP 1.14; Eel River Road, CR 240B, MP 7.85 and MP 8.10; Laytonville Dos Rios Road, CR 322, MP 3.34, MP 3.66, and MP 4.19; Pine Ridge Road, CR 220, MP 4.52 and MP 5.30; Blackhawk Drive, CR 371, MP 2.00; Low Gap Road, CR 212, MP 19.40 (Countywide); and authorize Chair to sign same.
End

PREVIOUS BOARD/BOARD COMMITTEE ACTIONS:
By Resolution Number (No.) 16-151 (December 20, 2016) the Board authorized declaring existence of a local emergency related to the 2016 Winter Storms Event. By Resolution No. 17-011 (January 24, 2017) Board authorized declaring existence of a local emergency related to the January 2017 Winter Storms Event.

SUMMARY OF REQUEST:
These Twelve Department of Transportation contracts will provide for the construction of 2016 and 2017 Storm Damage Permanent Repairs on Peachland Road, CR 128, MP 0.35, Mil...

Click here for full text